TLC Overview

TLC Banner

Note: The TLC framework provides assistance and standard guidance to support consistent system development and project management methodologies.  Alternate development methodologies/frameworks/guidelines may be acceptable, provided applicable federal legislative mandates (eg, FITARA and Clinger Cohen Act), and OMB/HHS policy are met.

Contractors must utilize a formal framework, methodology, and/or capability maturity model in support of CMS' IT development efforts, thereby enhancing the degree of predictability and optimization of processes used, and increasing reliability and sustainability in producing required outcomes.

Welcome to the Target Life Cycle!

TLC Overview

The TLC is CMS's new system development life cycle governance process that promotes business flexibility, and replaces point-in-time gate reviews with continuous evaluation and situational reviews governance. The TLC sets governance expectations for all stakeholders who are developing and maintaining IT solutions.  There are four (4) distinct phases: Initiate, Develop, Operate, and Retire.

 

Initiate

Develop

Operate

Retire

  • Establish Requirements / User stories
  • Deploy to non-Production environment
  • Complete any integration testing
  • Complete TLC System Profile
  • Maintain availability and performance
  • Maintain accurate TLC System Profile
  • Store and maintain required documentation
  • Proactively inputting upcoming changes to the system profile

*Note: This is a template for the Business Case and can be used to begin gathering information. However, the actual business case for your project must be completed in EASi.


New business need or need a Life Cycle ID for an existing IT investment? Begin here:

(Internal CMS Link)

 

Helpful Links
TLC FAQs (PDF)
Technical Review Board (TRB) Slidedecks (ZIP)
Optional Project Management Templates (ZIP)
Investment Reporting Life Cycle (PDF)
Note: this document provides an overview of the major IT Capital Planning and Investment Control reporting requirements, but is not inclusive of all OMB-required artifacts. For reporting guidance tailored to your situation, contact [email protected].
TLC Guidance  (PDF)
TLC Overview  (PPTX)
Feb 23, 2021 Tech Topics TLC Video 
Note: the TLC presentation starts at 1:44 and ends at 42:34.

 

For inquires about the Target Life Cycle, please contact CMS IT Governance at [email protected].

Page Last Modified:
05/26/2022 02:43 PM